1a9439d013
The real bottleneck is domain MODELLING. Phase B is organized as one program with sub-programs per domain, each run through the SAME 7-stage production line. No new runtime framework, no new module (ADR-009, Freeze v1.0) — only program data + a derived reporting view. - Customer enters by INDUSTRY, not regulation: Industry -> Domain Model -> Requirement Sources -> Requirements -> Capabilities -> ... -> Completeness. - 7-stage checklist identical for every domain (Domain Model / Requirement Sources / Capability Registry / Transition Patterns / Playbooks / Reference Scenarios / Completeness) with per-stage ownership. README generalized to the framework. - Each domain lists typical_requirement_sources + typical_certifications -> pre-onboarding capability HYPOTHESIS (the ETO insight; feeds Company 2A as inferred, never confirmed). - Backlog v1 (by customer value): 1 Industrial Automation, 2 Environmental, 3 Automotive, 4 Medical, 5 Energy. Five domain-definition shells (environmental restructured to the unified shape, law-first preserved). - Per-domain KPI is DERIVED from the real corpus (computed-not-stored; sources modelled / transition patterns / playbooks / reference scenarios), NOT a curated number. Reference suite renders maturity bars: Industrial Automation 43% (3/7 sources) leads, Environmental 0% (work ahead). Backlog (value) and KPI (corpus state) are deliberately separated. - ADR-009: Domain Knowledge Program framework. Honest known refinement: regulation-ID normalization (CRA vs Cyber Resilience Act) aliased in the KPI. 7 program-contract tests (backlog order + industry-first + derived-not-stored), check-loc 0. Knowledge data + ADR + reference harness = non-runtime -> no deploy (ADR-001). Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
23 lines
1.2 KiB
YAML
23 lines
1.2 KiB
YAML
# Domain Knowledge Program — Industrial Automation (backlog rank 1, highest current customer value).
|
|
# A domain DEFINITION, not corpus content. The 7-stage progress is DERIVED from the corpus by the
|
|
# reference suite (computed-not-stored), never stored here. See programs/README.md for the checklist.
|
|
|
|
id: PROG-industrial-automation
|
|
name: "Industrial Automation Domain"
|
|
industry: "Maschinen-/Anlagenbau, Industrieautomation, Parksysteme, Verpackungsmaschinen"
|
|
customer_entry: "Ich baue Verpackungsmaschinen / Parksysteme / Industrieanlagen."
|
|
backlog_rank: 1
|
|
rationale: "höchster aktueller Kundennutzen — bereits am weitesten modelliert (CRA + MaschinenVO)."
|
|
status: in_progress
|
|
|
|
# Stage 2 — the requirement sources that typically apply to this industry
|
|
typical_requirement_sources: [CRA, MaschinenVO, EMV, RED, DataAct, IEC62443, NIS2]
|
|
|
|
# pre-onboarding capability HYPOTHESIS (nicht Wahrheit, vgl. ETO): feeds Company 2A as `inferred`
|
|
typical_certifications: [ISO9001, ISO27001]
|
|
|
|
ownership: "Stufe 1 Reasoning · 2 Legal-KG · 3 Execution · 4-7 Reasoning"
|
|
note: >
|
|
Diese Domäne hat den Vorlauf: CRA + MaschinenVO sind als Convergence-Pattern, RTS und Playbooks
|
|
bereits (teilweise) im Korpus. EMV/RED/IEC62443/NIS2 sind identifiziert, aber noch nicht modelliert.
|