Files
Sharang Parnerkar 2d9fec3a6d
Build pitch-deck / build-push-deploy (push) Successful in 1m53s
CI / go-lint (push) Has been skipped
CI / python-lint (push) Has been skipped
CI / nodejs-lint (push) Has been skipped
CI / test-go-consent (push) Successful in 34s
CI / test-python-voice (push) Successful in 36s
CI / test-bqas (push) Successful in 36s
feat(pitch-print): 10 slide redesigns from parallel agent review
Per the user's batch review of the rendered PDF. Five subagents ran in parallel,
each owning a different slide file; this is the merged result.

Slide 10 — Regulatory Landscape (PrintProductSlides)
  8 regulatory categories now render as a 2×4 icon-tile grid (was a DataTable):
  Lock / Shield / Brain / Globe / ShieldCheck / Banknote / Heart / Users.
  10 industry profiles now each show an icon next to the name
  (Factory for Maschinenbau Kernfokus, plus Heart, Banknote, ShoppingCart, Cpu,
  Wifi, Brain, ShieldCheck, BookOpen, Landmark, Building2).

Slide 12 — How It Works (PrintProductSlides)
  Step rail and day timeline pulled together (was a big empty middle).
  Added a "Was Sie wann bekommen" 4-column benefit block in the bottom third
  (Shield/FileText/CheckCircle2/Zap), with mid-page "Median 14 Tage" callout.

Slide 13 — Market TAM / SAM / SOM (PrintMarketSlides)
  Dropped MarketFunnel primitive. Left column: SVG nested concentric circles
  (TAM r=60 violet, SAM r=36 violet, SOM r=14 amber as Kernmarkt). Right column:
  three stacked TAM/SAM/SOM info cards with mono kicker, big EUR value, growth
  rate, one-line description; SOM card carries amber accent + "← unser Kernmarkt".

Slide 14 — Pricing green box (PrintProductSlides)
  Net-effect callout expanded from 2 lines to a full breakdown:
  Pentests +€13k / CE-Risiko +€9k / Compliance-Zeit (−60%) +€15k /
  Audit-Vorber. (auto) +€9k / Legal-Stunden (−40%) +€5k / Schulungen +€4k.
  Italic footnote: "Plus Vermeidung von Bußgeldern und gewonnene RFQs."

Slide 17 — Competition AppSec title (PrintCompetitionSlides)
  Title rewritten to investor-friendly framing — "Cyber-Security: BreakPilot
  ersetzt das ganze AppSec-Stack" (was SAST + DAST + SCA + Pentesting).

Slide 18 — Team founder bios (PrintMarketSlides)
  Prose paragraphs replaced with 5 icon-bulleted skill/achievement lines per
  founder. Benjamin gets violet-50 tiles (Briefcase, RefreshCw, Handshake,
  Scale, Lightbulb). Sharang gets amber-50 tiles (Code, TrendingUp, CreditCard,
  ShieldCheck, Cpu). Photo + name + role + equity header preserved.

Slide 23 — KPIs trajectory (PrintNewSlides)
  Each of the 8 KPI tiles now has a 15mm × 8mm SVG sparkline at the bottom
  showing the 5-year progression. Stroke color adapts per metric (violet
  default, emerald for cash/margin, red→emerald for EBIT/net-income across
  break-even). All-zero series fall back to em-dash. Awkward "0 → 0" prefix
  suppressed on missing-data tiles.

Slide 28 — Regulatory Pillars (PrintAnnexSlides)
  Rebuilt as 4 actual vertical pillars (was 2×2 box grid). Each pillar has:
  capital (top, gradient tint, mono kicker + 01-04 number), shaft (white card
  with title + description + 2mm colored left border), base (bottom, darker
  tint, mono law citations). A shared horizontal "ground line" below all four
  pillars completes the architectural reference.

Slide 29 — Architecture 3D (PrintDiagrams)
  Faked 3D depth via staggered right indent (0/2/4mm), inset top highlight
  and bottom seam shadows, per-layer drop-shadow with rising opacity. Layer 03
  reads as the foundation; layer 01 floats on top. PlaneConnector chevrons
  replace the simple SVG down-arrows between tiers. Text stays horizontal.

Slide 31 — Tech Stack (PrintNewSlides)
  Cards now have 14mm violet-gradient icon tiles (was 8mm flat), mono kicker
  number, 12pt category name, italic one-line blurb, and the techs as rounded
  chip tags (violet-50 / violet-200, mono 7.5pt) instead of a flat mono list.
  Title cleaned: "100 % " → "100%".

All files under 500 LOC except PrintIntroSlides (515, preexisting issue).
TypeScript clean, next build green, all 38 routes compile.

Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
2026-05-20 18:11:58 +02:00
..

Tue Apr 14 09:22:10 AM CEST 2026

Tue Apr 14 09:27:05 AM CEST 2026 Tue Apr 14 09:32:36 AM CEST 2026 Tue Apr 15 rebuild trigger Tue Apr 15 rebuild 2