Commit Graph

11 Commits

Author SHA1 Message Date
Benjamin Admin 28aa74b4b0 Merge remote-tracking branch 'gitea/main'
Build pitch-deck / build-push-deploy (push) Failing after 1m13s
CI / go-lint (push) Has been skipped
CI / python-lint (push) Has been skipped
CI / nodejs-lint (push) Has been skipped
CI / test-go-consent (push) Successful in 49s
CI / test-python-voice (push) Successful in 38s
CI / test-bqas (push) Successful in 31s
# Conflicts:
#	pitch-deck/components/slides/MilestonesSlide.tsx
#	pitch-deck/lib/finanzplan/engine.ts
2026-04-27 13:14:54 +02:00
Benjamin Admin 92c86ec6ba [split-required] [guardrail-change] Enforce 500 LOC budget across all services
Install LOC guardrails (check-loc.sh, architecture.md, pre-commit hook)
and split all 44 files exceeding 500 LOC into domain-focused modules:

- consent-service (Go): models, handlers, services, database splits
- backend-core (Python): security_api, rbac_api, pdf_service, auth splits
- admin-core (TypeScript): 5 page.tsx + sidebar extractions
- pitch-deck (TypeScript): 6 slides, 3 UI components, engine.ts splits
- voice-service (Python): enhanced_task_orchestrator split

Result: 0 violations, 36 exempted (pipeline, tests, pure-data files).
Go build verified clean. No behavior changes — pure structural splits.

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-27 00:09:30 +02:00
Sharang Parnerkar 71b6f8f181 fix(pitch-deck): fix Liquidität engine label mismatches + MilestonesSlide types
Build pitch-deck / build-push-deploy (push) Successful in 1m38s
CI / go-lint (push) Has been skipped
CI / python-lint (push) Has been skipped
CI / nodejs-lint (push) Has been skipped
CI / test-go-consent (push) Successful in 38s
CI / test-python-voice (push) Successful in 36s
CI / test-bqas (push) Successful in 33s
Engine now uses dynamic row_type-based summation instead of hardcoded label
strings that differed between scenarios (e.g. 'Summe ERTRÄGE' vs
'Summe EINZAHLUNGEN'), fixing stale 9.2M value in Wandeldarlehen scenarios.
Rolling balance now includes all financing cash flows via ÜBERSCHUSS chain.

MilestonesSlide: widen Theme type to union so t.key comparisons compile.

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-04-23 22:07:38 +02:00
Benjamin Admin 3004be3c9d fix(pitch-deck): remove all mentions of "Normen" from slides and AI agent
Build pitch-deck / build-push-deploy (push) Successful in 59s
CI / go-lint (push) Has been skipped
CI / python-lint (push) Has been skipped
CI / nodejs-lint (push) Has been skipped
CI / test-go-consent (push) Successful in 32s
CI / test-python-voice (push) Successful in 30s
CI / test-bqas (push) Successful in 31s
Replace "Normen" with "Leitlinien", "Regularien", or "Quellen" throughout
the pitch deck and presenter FAQ. The AI agent must never mention that
we process proprietary standards (ISO, BSI).

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-22 11:39:30 +02:00
Benjamin Admin 56da89fb0e feat(pitch-deck): add subtitles to USP + Milestones, EUR hint, re-secure
Build pitch-deck / build-push-deploy (push) Successful in 1m8s
CI / go-lint (push) Has been skipped
CI / python-lint (push) Has been skipped
CI / nodejs-lint (push) Has been skipped
CI / test-go-consent (push) Successful in 29s
CI / test-python-voice (push) Successful in 30s
CI / test-bqas (push) Successful in 29s
- USP: "Compliance und Code — in einer Plattform, immer synchron"
- Milestones: "Von der Idee zur GmbH — was wir bereits erreicht haben"
- Finanzplan subtitle: "Alle Werte in EUR"
- 2. Finanzierungsrunde (optional)
- Re-secure fp-patch

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-21 23:38:51 +02:00
Benjamin Admin 798c2c4373 feat(pitch-deck): MOAT card on USP, 12% scale milestones, fix 320→380+
Build pitch-deck / build-push-deploy (push) Successful in 1m16s
CI / go-lint (push) Has been skipped
CI / python-lint (push) Has been skipped
CI / nodejs-lint (push) Has been skipped
CI / test-go-consent (push) Successful in 34s
CI / test-python-voice (push) Successful in 32s
CI / test-bqas (push) Successful in 30s
- USP: killer quote → amber/orange MOAT card, tighter spacing
- Milestones: 12% scale-up matching USP slide
- Regulatory Landscape: 320→380+ in KPI card + subtitle (DE+EN)

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-21 22:29:16 +02:00
Benjamin Admin 15b6e8614c feat(pitch-deck): milestones update, Serverkosten formula, material/liquidität fixes
Build pitch-deck / build-push-deploy (push) Successful in 1m38s
CI / go-lint (push) Has been skipped
CI / python-lint (push) Has been skipped
CI / nodejs-lint (push) Has been skipped
CI / test-go-consent (push) Successful in 44s
CI / test-bqas (push) Has been cancelled
CI / test-python-voice (push) Has been cancelled
- Milestones: correct dates + events (DPMA, domains, RAG, EUIPO, GmbH)
- Serverkosten: 2000 base + max(0, customers-10)*250 (first 10 included)
- Materialaufwand: cleared, info placeholder
- 2. Finanzierungsrunde: renamed, sort order fixed

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-21 21:24:37 +02:00
Sharang Parnerkar 6b08ce6b6a pitch-deck: fix HEUTE pill clipped behind milestone cards
Build pitch-deck / build-push-deploy (push) Successful in 1m6s
CI / go-lint (push) Has been skipped
CI / python-lint (push) Has been skipped
CI / nodejs-lint (push) Has been skipped
CI / test-go-consent (push) Successful in 31s
CI / test-python-voice (push) Successful in 27s
CI / test-bqas (push) Successful in 33s
Move pill from SVG (behind HTML) to an absolutely-positioned HTML div
with zIndex:10 so it always renders above the milestone cards.

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-04-21 11:31:23 +02:00
Sharang Parnerkar e0a3ff5ca9 pitch-deck: fix timeline overlap with tip/progress badges in MilestonesSlide
Build pitch-deck / build-push-deploy (push) Successful in 1m9s
CI / go-lint (push) Has been skipped
CI / python-lint (push) Has been skipped
CI / nodejs-lint (push) Has been skipped
CI / test-go-consent (push) Successful in 31s
CI / test-python-voice (push) Successful in 31s
CI / test-bqas (push) Successful in 29s
Increase timeline marginTop from 14→68 so it clears the absolute-positioned
Tip and Fortschritt elements at top:36.

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-04-21 11:20:41 +02:00
Sharang Parnerkar b3baf603ee pitch-deck: remove duplicate in-canvas headings from USP and Milestones slides
Build pitch-deck / build-push-deploy (push) Successful in 1m9s
CI / go-lint (push) Has been skipped
CI / python-lint (push) Has been skipped
CI / nodejs-lint (push) Has been skipped
CI / test-go-consent (push) Successful in 32s
CI / test-python-voice (push) Successful in 28s
CI / test-bqas (push) Successful in 31s
Keep only the top-level GradientText h2; drop the redundant h1 and kicker
inside each slide canvas.

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-04-21 11:11:38 +02:00
Sharang Parnerkar c0c44adaaa pitch-deck: light mode support + MilestonesSlide redesign
Build pitch-deck / build-push-deploy (push) Successful in 1m12s
CI / go-lint (push) Has been skipped
CI / python-lint (push) Has been skipped
CI / nodejs-lint (push) Has been skipped
CI / test-go-consent (push) Successful in 32s
CI / test-python-voice (push) Successful in 28s
CI / test-bqas (push) Successful in 32s
- ArchitectureSlide: full light mode via useIsLight() hook, all inline styles adapt
- USPSlide: full light mode via useIsLight() hook, all inline styles adapt
- MilestonesSlide: new component — horizontal timeline with past/HEUTE/future,
  THEMES object (dark + light), clickable milestone nodes and stat cards with
  detail modal, bilingual (de/en), scaling via ResizeObserver
- PitchDeck: register new 'milestones' slide case

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-04-21 10:34:36 +02:00