Files
breakpilot-compliance/backend-compliance/knowledge/reference_transition_scenarios
Benjamin Admin f78e03bd0a docs(knowledge): Reference Transition Scenarios (RTS-001..003) + ISO9001->CRA pattern
Three ANONYMIZED reference transition scenarios (no real company names stored) = canonical
regression scenarios that test the KNOWLEDGE, not just the engine. Each pins an Expected
Outcome (expected_likely_covered + expected_delta); every commit must reproduce it (identical
or better).

- RTS-001 automotive supplier (TISAX+ISO27001) -> CRA: mature ISMS, standard CRA delta.
- RTS-002 classic machine builder (ISO9001) -> CRA: only process discipline -> MUCH larger delta
  (10 missing vs 3 covered). New TP-ISO9001-CRA-v1 pattern (different shape).
- RTS-003 networked machine builder (ISMS) -> CRA: highlights the Data Act.

Data Act is modelled as UNCERTAIN (a hypothesis), never a fixed gilt/gilt-nicht: the generator
checks the engine SURFACES the uncertainty + the deciding question (generates_usage_data) and
never wrongly ASSERTS applicability. All three RTS PASS.

Non-runtime knowledge + reference harness -> no deploy (ADR-001). Names deliberately absent.

Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
2026-06-27 08:46:20 +02:00
..