Files
breakpilot-compliance/ai-compliance-sdk/data/ce-libraries/roles-library-20.md
Benjamin Admin 4f6bc8f6f6
Some checks failed
CI/CD / go-lint (push) Has been skipped
CI/CD / python-lint (push) Has been skipped
CI/CD / nodejs-lint (push) Has been skipped
CI/CD / test-go-ai-compliance (push) Failing after 37s
CI/CD / test-python-backend-compliance (push) Successful in 39s
CI/CD / test-python-document-crawler (push) Successful in 26s
CI/CD / test-python-dsms-gateway (push) Successful in 23s
CI/CD / validate-canonical-controls (push) Successful in 12s
CI/CD / Deploy (push) Has been skipped
feat(training+controls): interactive video pipeline, training blocks, control generator, CE libraries
Interactive Training Videos (CP-TRAIN):
- DB migration 022: training_checkpoints + checkpoint_progress tables
- NarratorScript generation via Anthropic (AI Teacher persona, German)
- TTS batch synthesis + interactive video pipeline (slides + checkpoint slides + FFmpeg)
- 4 new API endpoints: generate-interactive, interactive-manifest, checkpoint submit, checkpoint progress
- InteractiveVideoPlayer component (HTML5 Video, quiz overlay, seek protection, progress tracking)
- Learner portal integration with automatic completion on all checkpoints passed
- 30 new tests (handler validation + grading logic + manifest/progress + seek protection)

Training Blocks:
- Block generator, block store, block config CRUD + preview/generate endpoints
- Migration 021: training_blocks schema

Control Generator + Canonical Library:
- Control generator routes + service enhancements
- Canonical control library helpers, sidebar entry
- Citation backfill service + tests
- CE libraries data (hazard, protection, evidence, lifecycle, components)

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-16 21:41:48 +01:00

6.8 KiB
Raw Blame History

Roles Library — 20 Rollen vollständig beschrieben

Diese Rollenbibliothek beschreibt typische beteiligte Personengruppen bei Planung, Betrieb, Wartung und Prüfung von Maschinen oder Anlagen. Die Struktur ist so gestaltet, dass sie direkt in eine Compliance, CE oder RisikobeurteilungsEngine integriert werden kann.

Struktur pro Rolle

role_id

title

description

primary_responsibilities

required_training

allowed_access

typical_lifecycle_phases

safety_relevance

R01 Maschinenbediener (Operator)

Description: Person, die die Maschine im täglichen Betrieb bedient.

Primary Responsibilities: - Starten und Stoppen der Maschine - Überwachung des Produktionsprozesses - Meldung von Störungen

Required Training: - Bedienerschulung - Sicherheitsunterweisung

Allowed Access: - Bedienpanel - Start/Stop Funktionen

Typical Lifecycle Phases: Normalbetrieb, Produktionsstart, Produktionsstopp

Safety Relevance: Hoch

R02 Einrichter (Setup Technician)

Description: Fachpersonal, das Maschinen für neue Produktionsaufträge einrichtet.

Primary Responsibilities: - Parametrierung der Maschine - Werkzeugwechsel - Prozessoptimierung

Required Training: - Maschineneinrichtung - Sicherheitsfunktionen

Allowed Access: - Setup-Modus - Parametrierung

Typical Lifecycle Phases: Einrichten, Produktionsstart

Safety Relevance: Hoch

R03 Wartungstechniker

Description: Techniker für Inspektion, Wartung und Reparatur.

Primary Responsibilities: - Wartung - Austausch von Komponenten - Fehlerdiagnose

Required Training: - Wartungsschulung - LockoutTagout Verfahren

Allowed Access: - Wartungsmodus - interne Maschinenteile

Typical Lifecycle Phases: Wartung, Reparatur

Safety Relevance: Sehr hoch

R04 Servicetechniker

Description: Externer oder interner Spezialist für technische Unterstützung.

Primary Responsibilities: - Fehleranalyse - Systemupdates - technische Beratung

Required Training: - Herstellerschulung

Allowed Access: - Servicezugang

Typical Lifecycle Phases: Reparatur, Fernwartung

Safety Relevance: Hoch

R05 Reinigungspersonal

Description: Personal für Reinigung der Anlage.

Primary Responsibilities: - Reinigung der Maschine - Entfernen von Produktionsrückständen

Required Training: - Sicherheitsunterweisung

Allowed Access: - Reinigungsmodus

Typical Lifecycle Phases: Reinigung

Safety Relevance: Mittel

R06 Produktionsleiter

Description: Verantwortlich für Produktionsplanung und -überwachung.

Primary Responsibilities: - Produktionsplanung - Prozessüberwachung

Required Training: - Produktionsmanagement

Allowed Access: - Produktionsdaten

Typical Lifecycle Phases: Normalbetrieb

Safety Relevance: Mittel

R07 Sicherheitsbeauftragter

Description: Verantwortlicher für Arbeitssicherheit.

Primary Responsibilities: - Sicherheitsüberwachung - Risikoanalysen

Required Training: - Arbeitssicherheit

Allowed Access: - Sicherheitsdokumentation

Typical Lifecycle Phases: Alle

Safety Relevance: Sehr hoch

R08 Elektriker

Description: Fachkraft für elektrische Systeme.

Primary Responsibilities: - elektrische Wartung - Fehlersuche

Required Training: - Elektrotechnische Ausbildung

Allowed Access: - Schaltschrank

Typical Lifecycle Phases: Wartung, Reparatur

Safety Relevance: Sehr hoch

R09 Softwareingenieur

Description: Entwickler für Steuerungssoftware.

Primary Responsibilities: - Softwareentwicklung - Fehlerbehebung

Required Training: - Softwareentwicklung

Allowed Access: - Steuerungssysteme

Typical Lifecycle Phases: Softwareupdate

Safety Relevance: Hoch

R10 Instandhaltungsleiter

Description: Leitung der Wartungsabteilung.

Primary Responsibilities: - Wartungsplanung - Ressourcenkoordination

Required Training: - Instandhaltungsmanagement

Allowed Access: - Wartungsberichte

Typical Lifecycle Phases: Wartung

Safety Relevance: Hoch

R11 Anlagenfahrer

Description: Bediener komplexer Anlagen.

Primary Responsibilities: - Anlagenüberwachung

Required Training: - Anlagenbedienung

Allowed Access: - Steuerungssystem

Typical Lifecycle Phases: Normalbetrieb

Safety Relevance: Hoch

R12 Qualitätssicherung

Description: Verantwortlich für Qualitätskontrollen.

Primary Responsibilities: - Produktprüfung

Required Training: - Qualitätsmanagement

Allowed Access: - Qualitätsdaten

Typical Lifecycle Phases: Produktion

Safety Relevance: Niedrig

R13 Logistikpersonal

Description: Verantwortlich für Materialtransport.

Primary Responsibilities: - Materialbereitstellung

Required Training: - Logistikprozesse

Allowed Access: - Transportbereiche

Typical Lifecycle Phases: Transport

Safety Relevance: Mittel

R14 Fremdfirma

Description: Externe Dienstleister.

Primary Responsibilities: - Spezialarbeiten

Required Training: - Sicherheitsunterweisung

Allowed Access: - begrenzte Bereiche

Typical Lifecycle Phases: Wartung

Safety Relevance: Hoch

R15 Besucher

Description: Nicht geschulte Personen.

Primary Responsibilities: - keine

Required Training: - Sicherheitseinweisung

Allowed Access: - Besucherzonen

Typical Lifecycle Phases: Betrieb

Safety Relevance: Mittel

R16 Auditor

Description: Prüfer für Compliance und Sicherheit.

Primary Responsibilities: - Audits

Required Training: - Auditmethoden

Allowed Access: - Dokumentation

Typical Lifecycle Phases: Audit

Safety Relevance: Mittel

R17 IT-Administrator

Description: Verantwortlich für IT-Systeme.

Primary Responsibilities: - Netzwerkverwaltung

Required Training: - IT-Sicherheit

Allowed Access: - IT-Infrastruktur

Typical Lifecycle Phases: Betrieb

Safety Relevance: Hoch

R18 Fernwartungsdienst

Description: Externe Remote-Spezialisten.

Primary Responsibilities: - Remote Diagnose

Required Training: - Fernwartungssysteme

Allowed Access: - Remote-Zugang

Typical Lifecycle Phases: Fernwartung

Safety Relevance: Hoch

R19 Betreiber

Description: Eigentümer oder verantwortlicher Betreiber der Anlage.

Primary Responsibilities: - Gesamtverantwortung

Required Training: - Betreiberpflichten

Allowed Access: - Managementebene

Typical Lifecycle Phases: Alle

Safety Relevance: Sehr hoch

R20 Notfallpersonal

Description: Einsatzkräfte bei Unfällen.

Primary Responsibilities: - Rettung - Erste Hilfe

Required Training: - Notfallmanagement

Allowed Access: - Notfallzugänge

Typical Lifecycle Phases: Notfall

Safety Relevance: Kritisch