1a9439d013
The real bottleneck is domain MODELLING. Phase B is organized as one program with sub-programs per domain, each run through the SAME 7-stage production line. No new runtime framework, no new module (ADR-009, Freeze v1.0) — only program data + a derived reporting view. - Customer enters by INDUSTRY, not regulation: Industry -> Domain Model -> Requirement Sources -> Requirements -> Capabilities -> ... -> Completeness. - 7-stage checklist identical for every domain (Domain Model / Requirement Sources / Capability Registry / Transition Patterns / Playbooks / Reference Scenarios / Completeness) with per-stage ownership. README generalized to the framework. - Each domain lists typical_requirement_sources + typical_certifications -> pre-onboarding capability HYPOTHESIS (the ETO insight; feeds Company 2A as inferred, never confirmed). - Backlog v1 (by customer value): 1 Industrial Automation, 2 Environmental, 3 Automotive, 4 Medical, 5 Energy. Five domain-definition shells (environmental restructured to the unified shape, law-first preserved). - Per-domain KPI is DERIVED from the real corpus (computed-not-stored; sources modelled / transition patterns / playbooks / reference scenarios), NOT a curated number. Reference suite renders maturity bars: Industrial Automation 43% (3/7 sources) leads, Environmental 0% (work ahead). Backlog (value) and KPI (corpus state) are deliberately separated. - ADR-009: Domain Knowledge Program framework. Honest known refinement: regulation-ID normalization (CRA vs Cyber Resilience Act) aliased in the KPI. 7 program-contract tests (backlog order + industry-first + derived-not-stored), check-loc 0. Knowledge data + ADR + reference harness = non-runtime -> no deploy (ADR-001). Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
34 lines
1.7 KiB
YAML
34 lines
1.7 KiB
YAML
# Domain Knowledge Program — Environmental (backlog rank 2). A domain DEFINITION, not corpus content.
|
|
# LAW-FIRST: Umweltrecht -> Obligations -> Capabilities -> ISO 14001 -> Delta (never the reverse).
|
|
# 7-stage progress is DERIVED from the corpus (computed-not-stored). See programs/README.md.
|
|
|
|
id: PROG-environmental
|
|
name: "Environmental Domain"
|
|
industry: "Hersteller mit Umweltpflichten (z. B. Industriespülmaschinen, Anlagenbau)"
|
|
customer_entry: "Welche Umweltanforderungen gelten für mein Produkt (z. B. Industriespülmaschine)?"
|
|
backlog_rank: 2
|
|
rationale: "konkreter Kundenbezug (Abwasser/Chemikalien) — direkt nach Industrial Automation."
|
|
status: started
|
|
|
|
principle: >
|
|
ISO 14001 ist KEIN Umweltrecht, sondern ein Managementsystem (= ein Quellzustand). LAW-FIRST:
|
|
erst das Recht, dann welche vorhandenen Managementsysteme davon wahrscheinlich schon etwas abdecken.
|
|
|
|
# Stage 2 — the requirement-source areas of this domain (each becomes laws/obligations at Stage 2-3)
|
|
typical_requirement_sources: [water, chemicals, emissions, energy, waste, product_responsibility]
|
|
typical_certifications: [ISO14001, ISO9001] # pre-onboarding capability HYPOTHESIS (nicht Wahrheit)
|
|
|
|
# Reasoning capabilities to be modelled (Stage 3, @Execution) once the corpus lands
|
|
target_capabilities:
|
|
- chemical_management
|
|
- wastewater_management
|
|
- emissions_monitoring
|
|
- hazardous_substance_management
|
|
- energy_data_capture
|
|
- environmental_incident_management
|
|
|
|
ownership: "Stufe 1 Reasoning · 2 Legal-KG (HANDOFF, nur Recht+Pflichten) · 3 Execution (HANDOFF) · 4-7 Reasoning"
|
|
note: >
|
|
B3 (ISO 14001 -> Korpus-Transition) entsteht ZULETZT, erst wenn Recht + Capabilities bekannt sind.
|
|
Acceptance: Regulatory Completeness kippt `Environmental` von unsupported/open auf assessed.
|