4bfd552da7
(1) Harden the first Transition Pattern to the gold-standard template per quality checklist: versioned transition_goal (ISO27001:2022 -> CRA, applies 2027-12-11), source_state_variants (certified/isms_introduced/expired/limited_scope), each likely_covered assumption with a typed relationship (supports|partially_supports, never equivalent) + verification + rationale (the Warum) + an auditor-checkable reviewable_claim, delta as missing-capability + needed-info, an explicit rejected_assumptions section, and a determinism_goal. README schema updated to match. (2) New Reference-Suite scenario 4 (Transition): the generator READS the pattern YAML and runs it through the RS-005 Planning Engine + Company 2A -> coverage + question requests. Proves the architecture fully carries the pattern (17 caps -> 17 coverage + 17 requests; 9 HIGH delta = the real CRA gaps, 8 probably-covered from the ISMS). Now a living regression test: every future pattern runs through the same engine. Non-runtime knowledge + reference harness -> no deploy (ADR-001). Next: ISMS->TISAX once approved. Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>