Benjamin Admin
|
cc80e59e5e
|
feat(cra): Phase 4 — Vulnerability Disclosure + Post-Market Monitoring
Migration 121: compliance_cra_vulnerabilities table with full lifecycle tracking
- Status state machine: reported → triaged → patched → disclosed (+ withdrawn)
- CRA Art. 14(2) deadlines tracked: reported_to_enisa_at (24h), detailed_report_at (72h)
- CVE-ID, severity, CVSS, affected_components (JSONB), embargo_until
Backend endpoints in cra_routes.py:
- POST /vulnerabilities — create with validation (severity, CVSS range)
- GET /vulnerabilities — list with deadline-breach summary (24h/72h counters)
- PATCH /vulnerabilities/{id} — update fields + auto-set lifecycle timestamps
- DELETE /vulnerabilities/{id} — soft-delete (withdrawn)
- GET /monitoring — combined view: CRA deadlines + vuln summary + post-market checklist
Frontend:
- /vuln page: intake form, vuln cards with 24h/72h-countdown buttons,
status-transition flow with auto-timestamps
- /monitoring page: CRA deadlines (11.06.26 / 11.09.26 / 11.12.27), breach banner
if 24h/72h obligations missed, post-market checklist with deep-links
- Dashboard: +2 buttons (Vulns, Monitoring)
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
|
2026-05-18 22:08:49 +02:00 |
|
Benjamin Admin
|
1cf5de1d45
|
feat(cra): CRA Compliance module Phase 1+2+3 (intake, scope, path, requirements, backlog, sbom, checks)
Phase 1 — Intake + Scope + Path:
- Migration 119: compliance_cra_projects table (intake + classification + path + status state machine)
- Backend service cra_routes.py: CRUD + scope-check + path-select
- Deterministic Annex III/IV classifier (verbatim mapping from migration 059 wiki)
- Path validation per classification (CRITICAL → notified_body mandatory)
- Frontend: project list, dashboard, 3-step wizard (intake/scope/path)
- Sidebar entry under "CRA Compliance" (red)
Phase 2 — Annex I Requirements + Priorisierungs-Backlog:
- cra_annex_i_data.py: 40 Annex-I requirements (8 categories), 9 measures (M540-M548), 3 CRA deadlines
- Endpoints: /requirements (40 items), /backlog (priority-sorted with deadline pressure)
- Frontend: requirements table with filters + expandable details, backlog with deadline banner + score-ranked table
- Dashboard KPI cards (Critical count, days to CE deadline, etc.) + top-10 backlog snippet
Phase 3 — SBOM Upload + Automated Checks:
- Migration 120: compliance_cra_sboms (versioned uploads, CycloneDX + SPDX)
- SBOM endpoints: POST /sbom/upload (format detection, summary extraction), GET /sboms
- Checks reuse compliance_evidence_checks: init creates 6 default CRA checks, run executes
- Real implementations: cra_security_txt (HTTP + Contact: line) and cra_tls_cert_check (TLS handshake)
- Frontend: SBOM file upload + version list, Checks page with per-check URL input + Run button
Backend-Reuse: gap_projects (intake pre-population), compliance_evidence_checks/_check_results.
Tenant scoping via existing X-Tenant-ID header pattern.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
|
2026-05-18 17:56:52 +02:00 |
|