Commit Graph

2 Commits

Author SHA1 Message Date
Benjamin Admin a28db8f8f0 fix(admin): resolve all 266 TypeScript errors, enable strict build
Eliminate the pre-existing TS errors that were masked by
next.config.js `typescript.ignoreBuildErrors: true`, then turn the flag
OFF so the compiler is a real safety net for future changes. `next build`
and `tsc --noEmit` now pass with 0 errors.

The errors were not cosmetic — several exposed real latent bugs hidden by
the flag, e.g. the drafting-engine ConstraintEnforcer read non-existent
fields (`t.rule.dsfaRequired`, `d.required`, `r.title`), so its DSFA hard
gate and risk-flag checks were silently no-ops; scopeDefaults read
snake_case CompanyProfile fields that never matched the camelCase type
(generator defaults never populated). Both fixed by aligning code to the
current types.

Highlights:
- Vitest globals: add vitest-globals.d.ts (config already had globals:true)
  so the test files type-check; exclude Playwright specs from vitest.
- Add a minimal ambient `pg` module declaration (no @types/pg installed).
- Fix Next 15 route handlers to await Promise params.
- Reconcile drifted types across loeschfristen, compliance-scope, document-
  generator, drafting-engine, vendor-compliance, agent and more.

Pre-existing (NOT caused here, proven by stashing the diff): 3 vitest
logic tests still fail — getNextStep (2) and buildDocumentScope priority (1).

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-11 00:42:44 +02:00
Benjamin Admin 6d2de9b897 feat(iace): complete CE risk assessment — LLM tech-file generation, multi-format export, TipTap editor
CI/CD / go-lint (push) Has been skipped
CI/CD / python-lint (push) Has been skipped
CI/CD / nodejs-lint (push) Has been skipped
CI/CD / test-go-ai-compliance (push) Successful in 36s
CI/CD / test-python-backend-compliance (push) Successful in 33s
CI/CD / test-python-document-crawler (push) Successful in 24s
CI/CD / test-python-dsms-gateway (push) Successful in 21s
CI/CD / validate-canonical-controls (push) Successful in 13s
CI/CD / Deploy (push) Successful in 2s
Phase 1: Fix completeness gates G23 (require verified/rejected mitigations) and G09 (audit trail check)
Phase 2: LLM-based tech-file section generation with 19 German prompts and RAG enrichment
Phase 3: Multi-format document export (PDF/Excel/DOCX/Markdown/JSON)
Phase 4: Company profile → IACE data flow with auto component/classification creation
Phase 5: TipTap WYSIWYG editor replacing textarea for tech-file sections
Phase 6: User journey tests, developer portal API reference, updated documentation

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-16 12:50:53 +01:00