feat(training+controls): interactive video pipeline, training blocks, control generator, CE libraries
Some checks failed
CI/CD / go-lint (push) Has been skipped
CI/CD / python-lint (push) Has been skipped
CI/CD / nodejs-lint (push) Has been skipped
CI/CD / test-go-ai-compliance (push) Failing after 37s
CI/CD / test-python-backend-compliance (push) Successful in 39s
CI/CD / test-python-document-crawler (push) Successful in 26s
CI/CD / test-python-dsms-gateway (push) Successful in 23s
CI/CD / validate-canonical-controls (push) Successful in 12s
CI/CD / Deploy (push) Has been skipped
Some checks failed
CI/CD / go-lint (push) Has been skipped
CI/CD / python-lint (push) Has been skipped
CI/CD / nodejs-lint (push) Has been skipped
CI/CD / test-go-ai-compliance (push) Failing after 37s
CI/CD / test-python-backend-compliance (push) Successful in 39s
CI/CD / test-python-document-crawler (push) Successful in 26s
CI/CD / test-python-dsms-gateway (push) Successful in 23s
CI/CD / validate-canonical-controls (push) Successful in 12s
CI/CD / Deploy (push) Has been skipped
Interactive Training Videos (CP-TRAIN): - DB migration 022: training_checkpoints + checkpoint_progress tables - NarratorScript generation via Anthropic (AI Teacher persona, German) - TTS batch synthesis + interactive video pipeline (slides + checkpoint slides + FFmpeg) - 4 new API endpoints: generate-interactive, interactive-manifest, checkpoint submit, checkpoint progress - InteractiveVideoPlayer component (HTML5 Video, quiz overlay, seek protection, progress tracking) - Learner portal integration with automatic completion on all checkpoints passed - 30 new tests (handler validation + grading logic + manifest/progress + seek protection) Training Blocks: - Block generator, block store, block config CRUD + preview/generate endpoints - Migration 021: training_blocks schema Control Generator + Canonical Library: - Control generator routes + service enhancements - Canonical control library helpers, sidebar entry - Citation backfill service + tests - CE libraries data (hazard, protection, evidence, lifecycle, components) Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
This commit is contained in:
270
ai-compliance-sdk/data/ce-libraries/evidence-library-50.md
Normal file
270
ai-compliance-sdk/data/ce-libraries/evidence-library-50.md
Normal file
@@ -0,0 +1,270 @@
|
||||
Evidence Library — 50 Nachweisarten (vollständig beschrieben)
|
||||
|
||||
Jeder Nachweis dient dazu, die Wirksamkeit einer Schutzmaßnahme oder Sicherheitsanforderung nachzuweisen. Die Struktur ist so gestaltet, dass sie direkt in eine Compliance‑ oder CE‑Dokumentations‑Engine integriert werden kann.
|
||||
|
||||
Struktur eines Nachweises
|
||||
|
||||
evidence_id
|
||||
|
||||
title
|
||||
|
||||
purpose
|
||||
|
||||
verification_method
|
||||
|
||||
typical_steps
|
||||
|
||||
expected_result
|
||||
|
||||
generated_document
|
||||
|
||||
|
||||
### E01 Konstruktionsreview
|
||||
|
||||
**Purpose:** Überprüfung der sicherheitsrelevanten Konstruktion. Verification Method: Engineering Review. Typical Steps: Zeichnungen prüfen, Gefahrenstellen identifizieren, Schutzmaßnahmen bewerten. Expected Result: Konstruktion erfüllt Sicherheitsanforderungen. Generated Document: Review‑Protokoll.
|
||||
|
||||
|
||||
### E02 Sicherheitskonzept
|
||||
|
||||
**Purpose:** Dokumentation der Sicherheitsarchitektur. Verification Method: Architekturprüfung. Typical Steps: Systemgrenzen definieren, Schutzkonzept beschreiben. Expected Result: vollständiges Sicherheitskonzept. Generated Document: Sicherheitsdokument.
|
||||
|
||||
|
||||
### E03 Gefährdungsanalyse
|
||||
|
||||
**Purpose:** Identifikation aller relevanten Gefährdungen. Verification Method: strukturierte Analyse. Typical Steps: Gefährdungsliste erstellen, Risikobewertung durchführen. Expected Result: vollständige Hazard List. Generated Document: Risikoanalysebericht.
|
||||
|
||||
|
||||
### E04 Sicherheitsabstandsberechnung
|
||||
|
||||
**Purpose:** Nachweis sicherer Mindestabstände. Verification Method: mathematische Berechnung. Typical Steps: Bewegungsenergie bestimmen, Distanz berechnen. Expected Result: Mindestabstand erfüllt Anforderungen. Generated Document: Berechnungsprotokoll.
|
||||
|
||||
|
||||
### E05 Festigkeitsnachweis
|
||||
|
||||
**Purpose:** strukturelle Stabilität sicherstellen. Verification Method: statische Berechnung oder Simulation. Typical Steps: Belastungen definieren, Struktur analysieren. Expected Result: Bauteil hält Belastungen stand. Generated Document: Festigkeitsbericht.
|
||||
|
||||
|
||||
### E06 Risikoanalysebericht
|
||||
|
||||
**Purpose:** Dokumentation der Risikobeurteilung. Verification Method: Risikomodell. Typical Steps: Gefährdungen bewerten, Maßnahmen definieren. Expected Result: akzeptables Restrisiko. Generated Document: Risikobeurteilung.
|
||||
|
||||
|
||||
### E07 Architekturdiagramm
|
||||
|
||||
**Purpose:** Darstellung der Systemarchitektur. Verification Method: Systemmodellierung. Typical Steps: Komponenten und Schnittstellen beschreiben. Expected Result: nachvollziehbare Systemstruktur. Generated Document: Architekturdiagramm.
|
||||
|
||||
|
||||
### E08 Software‑Designreview
|
||||
|
||||
**Purpose:** Bewertung des Softwaredesigns. Verification Method: Entwicklerreview. Typical Steps: Architektur analysieren, Sicherheitslogik prüfen. Expected Result: robustes Design. Generated Document: Reviewbericht.
|
||||
|
||||
|
||||
### E09 Code Review
|
||||
|
||||
**Purpose:** Fehler und Sicherheitsprobleme erkennen. Verification Method: Peer Review. Typical Steps: Quellcode analysieren. Expected Result: sicherer und wartbarer Code. Generated Document: Code‑Review‑Protokoll.
|
||||
|
||||
|
||||
### E10 Sicherheitsanforderungsdokument
|
||||
|
||||
**Purpose:** Definition der Sicherheitsanforderungen. Verification Method: Dokumentationsprüfung. Typical Steps: Anforderungen sammeln und validieren. Expected Result: vollständige Security Requirements. Generated Document: Requirements Dokument.
|
||||
|
||||
|
||||
### E11 Funktionstest
|
||||
|
||||
**Purpose:** Überprüfung der Systemfunktion. Verification Method: Testfallausführung. Typical Steps: Testfälle definieren, Ergebnisse dokumentieren. Expected Result: Funktionen arbeiten korrekt. Generated Document: Testprotokoll.
|
||||
|
||||
|
||||
### E12 Integrationstest
|
||||
|
||||
**Purpose:** Zusammenspiel von Komponenten prüfen. Verification Method: Systemtests. Typical Steps: Schnittstellen testen. Expected Result: korrekte Interaktion. Generated Document: Integrationsbericht.
|
||||
|
||||
|
||||
### E13 Systemtest
|
||||
|
||||
**Purpose:** Gesamtfunktion der Maschine prüfen. Verification Method: End‑to‑End Test. Typical Steps: reale Betriebsbedingungen simulieren. Expected Result: System arbeitet stabil. Generated Document: Systemtestbericht.
|
||||
|
||||
|
||||
### E14 Sicherheitsfunktionstest
|
||||
|
||||
**Purpose:** Wirksamkeit der Sicherheitsfunktion prüfen. Verification Method: gezielte Auslösung. Typical Steps: Sicherheitsfunktion aktivieren. Expected Result: sichere Reaktion. Generated Document: Sicherheitsprotokoll.
|
||||
|
||||
|
||||
### E15 Not‑Halt Test
|
||||
|
||||
**Purpose:** Funktion des Not‑Halts sicherstellen. Verification Method: manuelle Betätigung. Typical Steps: Not‑Halt drücken, Stopzeit messen. Expected Result: Maschine stoppt sofort. Generated Document: Testbericht.
|
||||
|
||||
|
||||
### E16 Verriegelungstest
|
||||
|
||||
**Purpose:** Schutzsystem prüfen. Verification Method: mechanischer Test. Typical Steps: Tür öffnen während Betrieb. Expected Result: Maschine stoppt. Generated Document: Prüfprotokoll.
|
||||
|
||||
|
||||
### E17 Fault Injection Test
|
||||
|
||||
**Purpose:** Fehlerreaktionen prüfen. Verification Method: simulierte Fehler. Typical Steps: Sensorfehler auslösen. Expected Result: sichere Reaktion. Generated Document: Testreport.
|
||||
|
||||
|
||||
### E18 Simulationstest
|
||||
|
||||
**Purpose:** Verhalten im Modell prüfen. Verification Method: Simulation. Typical Steps: Szenarien simulieren. Expected Result: korrektes Verhalten. Generated Document: Simulationsbericht.
|
||||
|
||||
|
||||
### E19 Lasttest
|
||||
|
||||
**Purpose:** Verhalten unter Last prüfen. Verification Method: Belastungstest. Typical Steps: maximale Last anwenden. Expected Result: System bleibt stabil. Generated Document: Lasttestbericht.
|
||||
|
||||
|
||||
### E20 Stresstest
|
||||
|
||||
**Purpose:** Extrembedingungen prüfen. Verification Method: Überlastsimulation. Typical Steps: Grenzwerte testen. Expected Result: System bleibt kontrollierbar. Generated Document: Stresstestbericht.
|
||||
|
||||
|
||||
### E21 Schutzleiterprüfung
|
||||
|
||||
**Purpose:** Erdung überprüfen. Verification Method: elektrische Messung. Expected Result: ausreichende Leitfähigkeit. Generated Document: Messprotokoll.
|
||||
|
||||
|
||||
### E22 Isolationsmessung
|
||||
|
||||
**Purpose:** elektrische Isolation prüfen. Verification Method: Hochspannungsmessung. Expected Result: Isolation ausreichend. Generated Document: Prüfbericht.
|
||||
|
||||
|
||||
### E23 Hochspannungsprüfung
|
||||
|
||||
**Purpose:** elektrische Sicherheit testen. Verification Method: HV‑Test. Expected Result: keine Durchschläge. Generated Document: Testprotokoll.
|
||||
|
||||
|
||||
### E24 Kurzschlussprüfung
|
||||
|
||||
**Purpose:** Verhalten bei Kurzschluss prüfen. Verification Method: Simulation. Expected Result: sichere Abschaltung. Generated Document: Testbericht.
|
||||
|
||||
|
||||
### E25 Erdungsmessung
|
||||
|
||||
**Purpose:** Erdungssystem validieren. Verification Method: Widerstandsmessung. Expected Result: zulässiger Erdungswert. Generated Document: Messprotokoll.
|
||||
|
||||
|
||||
### E26 Penetration Test
|
||||
|
||||
**Purpose:** IT‑Sicherheit prüfen. Verification Method: Angriffssimulation. Expected Result: keine kritischen Schwachstellen. Generated Document: Pentest‑Report.
|
||||
|
||||
|
||||
### E27 Vulnerability Scan
|
||||
|
||||
**Purpose:** bekannte Schwachstellen erkennen. Verification Method: automatisierter Scan. Expected Result: Schwachstellenliste. Generated Document: Scanbericht.
|
||||
|
||||
|
||||
### E28 SBOM Prüfung
|
||||
|
||||
**Purpose:** Softwareabhängigkeiten prüfen. Verification Method: Komponentenliste analysieren. Expected Result: bekannte Risiken erkannt. Generated Document: SBOM‑Report.
|
||||
|
||||
|
||||
### E29 Dependency Scan
|
||||
|
||||
**Purpose:** Bibliotheken prüfen. Verification Method: CVE‑Abgleich. Expected Result: keine kritischen Abhängigkeiten. Generated Document: Scanreport.
|
||||
|
||||
|
||||
### E30 Update‑Signaturprüfung
|
||||
|
||||
**Purpose:** Authentizität von Updates prüfen. Verification Method: kryptographische Validierung. Expected Result: gültige Signatur. Generated Document: Verifikationsprotokoll.
|
||||
|
||||
|
||||
### E31 Betriebsanleitung
|
||||
|
||||
**Purpose:** sichere Nutzung dokumentieren. Verification Method: Dokumentationsprüfung. Expected Result: vollständige Anleitung. Generated Document: Handbuch.
|
||||
|
||||
|
||||
### E32 Wartungsanleitung
|
||||
|
||||
**Purpose:** sichere Wartung ermöglichen. Verification Method: Review. Expected Result: klare Wartungsprozesse. Generated Document: Wartungsdokument.
|
||||
|
||||
|
||||
### E33 Sicherheitsanweisung
|
||||
|
||||
**Purpose:** Sicherheitsregeln festlegen. Verification Method: Freigabeprozess. Expected Result: verbindliche Richtlinie. Generated Document: Sicherheitsdokument.
|
||||
|
||||
|
||||
### E34 Schulungsnachweis
|
||||
|
||||
**Purpose:** Kompetenz nachweisen. Verification Method: Teilnahmeprotokoll. Expected Result: Mitarbeiter geschult. Generated Document: Trainingszertifikat.
|
||||
|
||||
|
||||
### E35 Risikoabnahmeprotokoll
|
||||
|
||||
**Purpose:** Freigabe der Risikobeurteilung. Verification Method: Managementreview. Expected Result: Risiko akzeptiert. Generated Document: Freigabedokument.
|
||||
|
||||
|
||||
### E36 Freigabedokument
|
||||
|
||||
**Purpose:** formale Systemfreigabe. Verification Method: Genehmigungsprozess. Expected Result: System genehmigt. Generated Document: Freigabeprotokoll.
|
||||
|
||||
|
||||
### E37 Änderungsprotokoll
|
||||
|
||||
**Purpose:** Änderungen nachvollziehen. Verification Method: Change Management. Expected Result: Änderungsverlauf dokumentiert. Generated Document: Change Log.
|
||||
|
||||
|
||||
### E38 Auditbericht
|
||||
|
||||
**Purpose:** Compliance prüfen. Verification Method: Audit. Expected Result: Audit ohne kritische Abweichungen. Generated Document: Auditreport.
|
||||
|
||||
|
||||
### E39 Abnahmeprotokoll
|
||||
|
||||
**Purpose:** Endabnahme dokumentieren. Verification Method: Abnahmetest. Expected Result: System akzeptiert. Generated Document: Abnahmebericht.
|
||||
|
||||
|
||||
### E40 Prüfprotokoll
|
||||
|
||||
**Purpose:** Prüfergebnisse festhalten. Verification Method: standardisierte Tests. Expected Result: erfolgreiche Prüfung. Generated Document: Prüfprotokoll.
|
||||
|
||||
|
||||
### E41 Monitoring‑Logs
|
||||
|
||||
**Purpose:** Betriebsüberwachung. Verification Method: Loganalyse. Expected Result: keine Sicherheitsereignisse. Generated Document: Logreport.
|
||||
|
||||
|
||||
### E42 Ereignisprotokolle
|
||||
|
||||
**Purpose:** sicherheitsrelevante Ereignisse dokumentieren. Verification Method: Ereignisaufzeichnung. Expected Result: vollständige Historie. Generated Document: Ereignisbericht.
|
||||
|
||||
|
||||
### E43 Alarmberichte
|
||||
|
||||
**Purpose:** Systemalarme dokumentieren. Verification Method: Alarmanalyse. Expected Result: nachvollziehbare Alarmhistorie. Generated Document: Alarmreport.
|
||||
|
||||
|
||||
### E44 Incident‑Report
|
||||
|
||||
**Purpose:** Sicherheitsvorfall dokumentieren. Verification Method: Incident Management. Expected Result: Ursachenanalyse abgeschlossen. Generated Document: Incidentbericht.
|
||||
|
||||
|
||||
### E45 Wartungsbericht
|
||||
|
||||
**Purpose:** Wartungsarbeiten dokumentieren. Verification Method: Servicebericht. Expected Result: Wartung durchgeführt. Generated Document: Wartungsprotokoll.
|
||||
|
||||
|
||||
### E46 Redundanzprüfung
|
||||
|
||||
**Purpose:** Redundante Systeme testen. Verification Method: Failover‑Test. Expected Result: System bleibt funktionsfähig. Generated Document: Redundanzbericht.
|
||||
|
||||
|
||||
### E47 Sicherheitsvalidierung
|
||||
|
||||
**Purpose:** Gesamtvalidierung der Sicherheitsfunktionen. Verification Method: kombinierte Tests. Expected Result: Sicherheitsanforderungen erfüllt. Generated Document: Validierungsbericht.
|
||||
|
||||
|
||||
### E48 Cyber‑Security‑Audit
|
||||
|
||||
**Purpose:** IT‑Sicherheitsprüfung. Verification Method: Auditverfahren. Expected Result: Sicherheitsniveau bestätigt. Generated Document: Auditbericht.
|
||||
|
||||
|
||||
### E49 Konfigurationsprüfung
|
||||
|
||||
**Purpose:** Systemkonfiguration prüfen. Verification Method: Konfigurationsreview. Expected Result: sichere Einstellungen. Generated Document: Konfigurationsbericht.
|
||||
|
||||
|
||||
### E50 Endabnahmebericht
|
||||
|
||||
**Purpose:** finale Systemfreigabe. Verification Method: Abschlussprüfung. Expected Result: Maschine freigegeben. Generated Document: Endabnahmebericht.
|
||||
|
||||
3531
ai-compliance-sdk/data/ce-libraries/hazard-library-150.md
Normal file
3531
ai-compliance-sdk/data/ce-libraries/hazard-library-150.md
Normal file
File diff suppressed because it is too large
Load Diff
@@ -0,0 +1,145 @@
|
||||
Lifecycle Phases Library — 25 Lebensphasen vollständig beschrieben
|
||||
|
||||
Diese Bibliothek beschreibt die typischen Lebensphasen einer Maschine oder Anlage über ihren gesamten Lebenszyklus. Die Struktur ist so ausgelegt, dass sie direkt in eine CE‑Risikobeurteilungs‑ oder Compliance‑Engine integriert werden kann.
|
||||
|
||||
Struktur pro Lebensphase
|
||||
|
||||
phase_id
|
||||
|
||||
title
|
||||
|
||||
description
|
||||
|
||||
typical_activities
|
||||
|
||||
typical_hazards
|
||||
|
||||
involved_roles
|
||||
|
||||
safety_focus
|
||||
|
||||
|
||||
### LP01 Transport
|
||||
|
||||
**Description:** Bewegung der Maschine oder einzelner Komponenten vom Hersteller zum Installationsort. Typical Activities: - Verladen - Transport per LKW / Kran - Entladen Typical Hazards: - Absturz von Lasten - Quetschungen - Kollisionen Involved Roles: - Logistikpersonal - Kranführer Safety Focus: - Sichere Lastaufnahme - Transportverriegelungen
|
||||
|
||||
|
||||
### LP02 Lagerung
|
||||
|
||||
**Description:** Zwischenlagerung der Maschine oder Baugruppen vor Installation. Typical Activities: - Lagerhaltung - Schutz vor Umwelteinflüssen Typical Hazards: - Instabilität - Korrosion Involved Roles: - Logistikpersonal Safety Focus: - sichere Lagerposition - Schutzabdeckung
|
||||
|
||||
|
||||
### LP03 Montage
|
||||
|
||||
**Description:** Zusammenbau einzelner Komponenten zur vollständigen Maschine. Typical Activities: - mechanische Montage - Verschraubungen Typical Hazards: - Quetschungen - Absturz von Bauteilen Involved Roles: - Monteure Safety Focus: - sichere Montageverfahren
|
||||
|
||||
|
||||
### LP04 Installation
|
||||
|
||||
**Description:** Aufstellung und Anschluss der Maschine am Einsatzort. Typical Activities: - Positionierung - Anschluss von Energiequellen Typical Hazards: - elektrische Gefahren - mechanische Belastungen Involved Roles: - Installationspersonal - Elektriker Safety Focus: - korrekte Installation
|
||||
|
||||
|
||||
### LP05 Inbetriebnahme
|
||||
|
||||
**Description:** Erstmaliges Starten der Maschine nach Installation. Typical Activities: - Funktionstests - Parametrierung Typical Hazards: - unerwartete Bewegungen Involved Roles: - Servicetechniker - Einrichter Safety Focus: - sichere Testbedingungen
|
||||
|
||||
|
||||
### LP06 Parametrierung
|
||||
|
||||
**Description:** Konfiguration von Maschinenparametern und Steuerungswerten. Typical Activities: - Softwareeinstellungen - Prozessparameter definieren Typical Hazards: - Fehlkonfiguration Involved Roles: - Einrichter - Softwareingenieur Safety Focus: - sichere Parameter
|
||||
|
||||
|
||||
### LP07 Einrichten
|
||||
|
||||
**Description:** Vorbereitung der Maschine für einen Produktionsauftrag. Typical Activities: - Werkzeugwechsel - Prozessanpassung Typical Hazards: - Quetschungen - unerwartete Bewegungen Involved Roles: - Einrichter Safety Focus: - sichere Einrichtverfahren
|
||||
|
||||
|
||||
### LP08 Normalbetrieb
|
||||
|
||||
**Description:** regulärer Produktionsbetrieb. Typical Activities: - Maschinenbedienung - Prozessüberwachung Typical Hazards: - mechanische Gefahren Involved Roles: - Maschinenbediener Safety Focus: - sichere Bedienung
|
||||
|
||||
|
||||
### LP09 Automatikbetrieb
|
||||
|
||||
**Description:** vollautomatisierter Betrieb ohne direkte Bedienerinteraktion. Typical Activities: - automatisierte Produktionszyklen Typical Hazards: - Kollisionen Involved Roles: - Anlagenfahrer Safety Focus: - sichere Steuerungslogik
|
||||
|
||||
|
||||
### LP10 Handbetrieb
|
||||
|
||||
**Description:** Betrieb der Maschine im manuellen Modus. Typical Activities: - manuelle Bewegungssteuerung Typical Hazards: - direkte Nähe zu beweglichen Teilen Involved Roles: - Einrichter Safety Focus: - reduzierte Geschwindigkeit
|
||||
|
||||
|
||||
### LP11 Teach-Modus
|
||||
|
||||
**Description:** Programmierung von Bewegungsabläufen. Typical Activities: - Roboterprogrammierung Typical Hazards: - unerwartete Bewegungen Involved Roles: - Programmierer Safety Focus: - Zustimmschalter
|
||||
|
||||
|
||||
### LP12 Produktionsstart
|
||||
|
||||
**Description:** Übergang vom Stillstand zur Produktion. Typical Activities: - Start des Produktionszyklus Typical Hazards: - unerwarteter Start Involved Roles: - Maschinenbediener Safety Focus: - Startfreigabe
|
||||
|
||||
|
||||
### LP13 Produktionsstopp
|
||||
|
||||
**Description:** planmäßiges Stoppen der Produktion. Typical Activities: - Maschinenabschaltung Typical Hazards: - Restbewegungen Involved Roles: - Maschinenbediener Safety Focus: - kontrolliertes Stoppen
|
||||
|
||||
|
||||
### LP14 Prozessüberwachung
|
||||
|
||||
**Description:** Überwachung des laufenden Produktionsprozesses. Typical Activities: - Anzeigenkontrolle Typical Hazards: - Fehlinterpretation Involved Roles: - Anlagenfahrer Safety Focus: - Alarmüberwachung
|
||||
|
||||
|
||||
### LP15 Reinigung
|
||||
|
||||
**Description:** Entfernen von Produktionsrückständen. Typical Activities: - manuelle Reinigung Typical Hazards: - Kontakt mit gefährlichen Bereichen Involved Roles: - Reinigungspersonal Safety Focus: - Energieabschaltung
|
||||
|
||||
|
||||
### LP16 Wartung
|
||||
|
||||
**Description:** planmäßige Wartung der Maschine. Typical Activities: - Austausch von Verschleißteilen Typical Hazards: - unerwarteter Wiederanlauf Involved Roles: - Wartungstechniker Safety Focus: - Lockout Tagout
|
||||
|
||||
|
||||
### LP17 Inspektion
|
||||
|
||||
**Description:** Überprüfung des Maschinenzustands. Typical Activities: - Sichtprüfung Typical Hazards: - Zugang zu Gefahrenbereichen Involved Roles: - Wartungspersonal Safety Focus: - sichere Zugänge
|
||||
|
||||
|
||||
### LP18 Kalibrierung
|
||||
|
||||
**Description:** Justierung von Sensoren oder Messsystemen. Typical Activities: - Kalibrierprozesse Typical Hazards: - Fehlmessungen Involved Roles: - Techniker Safety Focus: - präzise Einstellung
|
||||
|
||||
|
||||
### LP19 Störungsbeseitigung
|
||||
|
||||
**Description:** Diagnose und Behebung von Störungen. Typical Activities: - Fehleranalyse Typical Hazards: - unerwartete Bewegungen Involved Roles: - Servicetechniker Safety Focus: - sichere Diagnoseverfahren
|
||||
|
||||
|
||||
### LP20 Reparatur
|
||||
|
||||
**Description:** Austausch oder Reparatur beschädigter Komponenten. Typical Activities: - Komponentenwechsel Typical Hazards: - mechanische Gefahren Involved Roles: - Wartungstechniker Safety Focus: - sichere Reparaturverfahren
|
||||
|
||||
|
||||
### LP21 Umrüstung
|
||||
|
||||
**Description:** Anpassung der Maschine für neue Produkte. Typical Activities: - Werkzeugwechsel Typical Hazards: - Quetschungen Involved Roles: - Einrichter Safety Focus: - sichere Umrüstprozesse
|
||||
|
||||
|
||||
### LP22 Software-Update
|
||||
|
||||
**Description:** Aktualisierung der Steuerungssoftware. Typical Activities: - Firmwareupdate Typical Hazards: - Fehlkonfiguration Involved Roles: - Softwareingenieur Safety Focus: - sichere Updateprozesse
|
||||
|
||||
|
||||
### LP23 Fernwartung
|
||||
|
||||
**Description:** Wartung über Remotezugriff. Typical Activities: - Diagnose Typical Hazards: - unautorisierter Zugriff Involved Roles: - Fernwartungsdienst Safety Focus: - sichere Authentifizierung
|
||||
|
||||
|
||||
### LP24 Außerbetriebnahme
|
||||
|
||||
**Description:** dauerhafte Stilllegung der Maschine. Typical Activities: - Abschaltung Typical Hazards: - Restenergie Involved Roles: - Betreiber Safety Focus: - sichere Abschaltung
|
||||
|
||||
|
||||
### LP25 Demontage / Entsorgung
|
||||
|
||||
**Description:** Zerlegung und Entsorgung der Maschine. Typical Activities: - Demontage Typical Hazards: - Absturz von Bauteilen Involved Roles: - Demontagepersonal Safety Focus: - sichere Demontageverfahren
|
||||
|
||||
@@ -0,0 +1,155 @@
|
||||
Maschinenkomponenten- und Energiequellenbibliothek
|
||||
|
||||
Dieses Dokument enthält zwei zentrale Bibliotheken für eine CE-Risikobeurteilungs- oder Compliance-Engine:
|
||||
|
||||
Maschinenkomponentenbibliothek (≈120 typische Komponenten)
|
||||
|
||||
Energiequellenbibliothek (≈20 Energiearten)
|
||||
|
||||
Diese Bibliotheken ermöglichen eine automatische Zuordnung von Gefährdungen, sobald ein Benutzer eine Maschine, Anlage oder Produktionslinie beschreibt.
|
||||
|
||||
1. Maschinenkomponentenbibliothek (120 Komponenten)
|
||||
|
||||
Struktur pro Komponente
|
||||
|
||||
component_id
|
||||
|
||||
name
|
||||
|
||||
category
|
||||
|
||||
description
|
||||
|
||||
typical_hazards
|
||||
|
||||
typical_energy_sources
|
||||
|
||||
Mechanische Komponenten
|
||||
|
||||
|
||||
### C001 Roboterarm C002 Roboter-Greifer C003 Förderband C004 Rollenförderer C005 Kettenförderer C006 Hubtisch C007 Linearachse C008 Rotationsachse C009 Pressmechanismus C010 Stanzwerkzeug C011 Schneidwerkzeug C012 Fräswerkzeug C013 Bohrspindel C014 Schleifaggregat C015 Werkzeugwechsler C016 Werkstückhalter C017 Spannvorrichtung C018 Greifersystem C019 Manipulator C020 Pick-and-Place-Einheit
|
||||
|
||||
Strukturelle Komponenten
|
||||
|
||||
|
||||
### C021 Maschinenrahmen C022 Schutzgehäuse C023 Schutzgitter C024 Schutzhaube C025 Zugangstür C026 Wartungsklappe C027 Podest C028 Leiter C029 Plattform C030 Fundament
|
||||
|
||||
Antriebskomponenten
|
||||
|
||||
|
||||
### C031 Elektromotor C032 Servomotor C033 Schrittmotor C034 Getriebe C035 Kupplung C036 Bremse C037 Riemenantrieb C038 Zahnradantrieb C039 Kettenantrieb C040 Spindelantrieb
|
||||
|
||||
Hydraulische Komponenten
|
||||
|
||||
|
||||
### C041 Hydraulikpumpe C042 Hydraulikzylinder C043 Hydraulikventil C044 Hydraulikleitung C045 Hydraulikaggregat C046 Hydraulikspeicher C047 Hydraulikfilter C048 Druckregler C049 Drucksensor C050 Hydraulikverteiler
|
||||
|
||||
Pneumatische Komponenten
|
||||
|
||||
|
||||
### C051 Pneumatikzylinder C052 Pneumatikventil C053 Druckluftleitung C054 Druckregler C055 Luftfilter C056 Kompressor C057 Pneumatikverteiler C058 Vakuumerzeuger C059 Sauggreifer C060 Drucksensor Pneumatik
|
||||
|
||||
Elektrische Komponenten
|
||||
|
||||
|
||||
### C061 Schaltschrank C062 Stromversorgung C063 Netzteil C064 Sicherung C065 Leistungsschalter C066 Relais C067 Sicherheitsrelais C068 Transformator C069 Steckverbinder C070 Kabelsystem
|
||||
|
||||
Steuerungskomponenten
|
||||
|
||||
|
||||
### C071 SPS C072 Sicherheits-SPS C073 Industrie-PC C074 Embedded Controller C075 Feldbusmodul C076 I/O-Modul C077 HMI-Bedienpanel C078 Touchpanel C079 Steuerungssoftware C080 Visualisierungssystem
|
||||
|
||||
Sensorik
|
||||
|
||||
|
||||
### C081 Positionssensor C082 Näherungssensor C083 Lichtschranke C084 Laserscanner C085 Kamerasystem C086 Drucksensor C087 Temperatursensor C088 Vibrationssensor C089 Drehzahlsensor C090 Kraftsensor
|
||||
|
||||
Aktorik
|
||||
|
||||
|
||||
### C091 Magnetventil C092 Linearantrieb C093 Rotationsantrieb C094 Servoregler C095 Ventilsteuerung C096 Aktuatorsteuerung C097 Motorsteuerung C098 Schütz C099 Relaisausgang C100 Leistungsmodul
|
||||
|
||||
Sicherheitskomponenten
|
||||
|
||||
|
||||
### C101 Not-Halt Taster C102 Sicherheitslichtgitter C103 Sicherheitslaserscanner C104 Sicherheitsmatte C105 Türverriegelung C106 Zweihandbedienung C107 Zustimmschalter C108 Sicherheitsrelais C109 Sicherheitssteuerung C110 Sicherheitsüberwachung
|
||||
|
||||
IT- und Netzwerkkomponenten
|
||||
|
||||
|
||||
### C111 Industrial Switch C112 Router C113 Firewall C114 Edge Computer C115 Gateway C116 Remote-Service-Gateway C117 Datenspeicher C118 Cloud-Schnittstelle C119 Netzwerkinterface C120 Diagnosemodul
|
||||
|
||||
2. Energiequellenbibliothek (20 Energiearten)
|
||||
|
||||
Struktur
|
||||
|
||||
energy_id
|
||||
|
||||
name
|
||||
|
||||
description
|
||||
|
||||
typical_components
|
||||
|
||||
typical_hazards
|
||||
|
||||
|
||||
### E01 Mechanische Energie Beschreibung: Bewegungsenergie durch rotierende oder lineare Bewegung.
|
||||
|
||||
|
||||
### E02 Elektrische Energie Beschreibung: Energie durch elektrische Spannung oder Stromfluss.
|
||||
|
||||
|
||||
### E03 Hydraulische Energie Beschreibung: Energie durch Flüssigkeitsdruck.
|
||||
|
||||
|
||||
### E04 Pneumatische Energie Beschreibung: Energie durch Druckluft.
|
||||
|
||||
|
||||
### E05 Thermische Energie Beschreibung: Energie in Form von Wärme.
|
||||
|
||||
|
||||
### E06 Chemische Energie Beschreibung: Energie durch chemische Reaktionen.
|
||||
|
||||
|
||||
### E07 Potenzielle Energie Beschreibung: Energie durch Höhenlage oder gespeicherte Last.
|
||||
|
||||
|
||||
### E08 Kinetische Energie Beschreibung: Energie durch Bewegung von Körpern.
|
||||
|
||||
|
||||
### E09 Strahlungsenergie Beschreibung: Energie durch elektromagnetische Strahlung.
|
||||
|
||||
|
||||
### E10 Laserenergie Beschreibung: konzentrierte optische Strahlung.
|
||||
|
||||
|
||||
### E11 Magnetische Energie Beschreibung: Energie durch magnetische Felder.
|
||||
|
||||
|
||||
### E12 Schallenergie Beschreibung: Energie durch akustische Wellen.
|
||||
|
||||
|
||||
### E13 Vibrationsenergie Beschreibung: Energie durch mechanische Schwingungen.
|
||||
|
||||
|
||||
### E14 Druckenergie Beschreibung: Energie durch gespeicherte Druckkräfte.
|
||||
|
||||
|
||||
### E15 Federenergie Beschreibung: Energie gespeichert in elastischen Komponenten.
|
||||
|
||||
|
||||
### E16 Rotationsenergie Beschreibung: Energie rotierender Bauteile.
|
||||
|
||||
|
||||
### E17 Softwaregesteuerte Energie Beschreibung: Energieflüsse ausgelöst durch Steuerungssoftware.
|
||||
|
||||
|
||||
### E18 Cyber-physische Energie Beschreibung: physische Aktionen ausgelöst durch digitale Systeme.
|
||||
|
||||
|
||||
### E19 KI-gesteuerte Energie Beschreibung: Energieflüsse gesteuert durch autonome Entscheidungslogik.
|
||||
|
||||
|
||||
### E20 Restenergie Beschreibung: gespeicherte Energie nach Abschaltung (z. B. Kondensatoren, Druckspeicher).
|
||||
|
||||
@@ -0,0 +1,246 @@
|
||||
Protection Measures Library — 200 Schutzmaßnahmen vollständig beschrieben
|
||||
|
||||
Diese Bibliothek beschreibt typische Schutzmaßnahmen für Maschinen, Anlagen, Software und cyber‑physische Systeme. Sie ist so strukturiert, dass sie direkt in eine CE‑Risikobeurteilungs‑Engine integriert werden kann.
|
||||
|
||||
Struktur pro Maßnahme
|
||||
|
||||
measure_id
|
||||
|
||||
title
|
||||
|
||||
category
|
||||
|
||||
description
|
||||
|
||||
typical_application
|
||||
|
||||
typical_verification
|
||||
|
||||
Die Maßnahmen sind in drei Hauptgruppen gegliedert: 1. Inherently Safe Design (konstruktive Maßnahmen) 2. Technische Schutzmaßnahmen 3. Benutzerinformation / organisatorische Maßnahmen
|
||||
|
||||
1 Inherently Safe Design (M001–M050)
|
||||
|
||||
|
||||
### M001 Gefahrenstelle konstruktiv eliminieren Description: Gefährliche Bewegung oder Energiequelle vollständig entfernen. Application: Redesign der Mechanik. Verification: Designreview.
|
||||
|
||||
|
||||
### M002 Bewegungsenergie reduzieren Description: Reduzierung kinetischer Energie bewegter Teile. Application: geringere Geschwindigkeiten. Verification: Berechnung.
|
||||
|
||||
|
||||
### M003 Geschwindigkeit begrenzen Description: Begrenzung maximaler Bewegungsgeschwindigkeit. Application: Roboter oder Fördertechnik. Verification: Systemtest.
|
||||
|
||||
|
||||
### M004 Kraft begrenzen Description: Begrenzung mechanischer Kräfte. Application: kollaborative Systeme. Verification: Kraftmessung.
|
||||
|
||||
|
||||
### M005 Sicherheitsabstände vergrößern Description: Abstand zwischen Mensch und Gefahrenzone erhöhen. Application: Layoutänderung. Verification: Distanzmessung.
|
||||
|
||||
|
||||
### M006 Kinematik ändern Description: Mechanische Bewegung so ändern, dass Gefahr reduziert wird. Application: Gelenkdesign. Verification: Simulation.
|
||||
|
||||
|
||||
### M007 Rotationsbewegung vermeiden Description: gefährliche Drehbewegungen eliminieren. Application: alternative Mechanik. Verification: Designprüfung.
|
||||
|
||||
|
||||
### M008 Scharfe Kanten entfernen Description: Abrunden oder Abdecken von Kanten. Application: Gehäuse. Verification: Sichtprüfung.
|
||||
|
||||
|
||||
### M009 sichere Materialwahl Description: Materialien mit geringer Bruchgefahr verwenden. Application: Strukturteile. Verification: Materialprüfung.
|
||||
|
||||
|
||||
### M010 Gewicht reduzieren Description: Verringerung der Masse beweglicher Teile. Application: Greifer oder Arme. Verification: Berechnung.
|
||||
|
||||
|
||||
### M011 redundante Konstruktion Description: Doppelte mechanische Sicherheit. Application: Tragstrukturen. Verification: Belastungstest.
|
||||
|
||||
|
||||
### M012 mechanische Begrenzung Description: Endanschläge begrenzen Bewegungsbereich. Application: Linearachsen. Verification: Funktionsprüfung.
|
||||
|
||||
|
||||
### M013 sichere Geometrie Description: Gestaltung verhindert Einklemmen. Application: Spaltgrößen. Verification: Designreview.
|
||||
|
||||
|
||||
### M014 stabile Konstruktion Description: Struktur verhindert Umkippen. Application: Maschinenrahmen. Verification: Stabilitätsberechnung.
|
||||
|
||||
|
||||
### M015 kollisionsfreie Bewegungsbahnen Description: Bewegungsplanung vermeidet Kollision. Application: Robotik. Verification: Simulation.
|
||||
|
||||
|
||||
### M016 sichere Greifer Description: Greifer verlieren Werkstück nicht. Application: Pick‑and‑Place. Verification: Belastungstest.
|
||||
|
||||
|
||||
### M017 sichere Halterungen Description: Bauteile fest fixieren. Application: Montagevorrichtungen. Verification: Inspektion.
|
||||
|
||||
|
||||
### M018 sichere Werkstückaufnahme Description: stabile Fixierung. Application: CNC‑Maschinen. Verification: Belastungstest.
|
||||
|
||||
|
||||
### M019 sichere Lageführung Description: Führung verhindert Fehlposition. Application: Fördertechnik. Verification: Test.
|
||||
|
||||
|
||||
### M020 sichere Lastführung Description: Last wird stabil transportiert. Application: Hebesysteme. Verification: Simulation.
|
||||
|
||||
|
||||
### M021 sichere Kraftübertragung Description: Vermeidung von Überlast. Application: Getriebe. Verification: Berechnung.
|
||||
|
||||
|
||||
### M022 sichere Energieübertragung Description: Energiefluss kontrollieren. Application: Motorsteuerung. Verification: Test.
|
||||
|
||||
|
||||
### M023 sichere Hydraulikauslegung Description: Drucksystem korrekt dimensionieren. Verification: Drucktest.
|
||||
|
||||
|
||||
### M024 sichere Pneumatikauslegung Description: sichere Druckbereiche definieren. Verification: Drucktest.
|
||||
|
||||
|
||||
### M025 sichere thermische Auslegung Description: Überhitzung verhindern. Verification: Temperaturmessung.
|
||||
|
||||
|
||||
### M026 Temperaturbegrenzung Description: maximal zulässige Temperatur definieren. Verification: Sensorprüfung.
|
||||
|
||||
|
||||
### M027 passive Kühlung Description: Wärmeabführung ohne aktive Systeme. Verification: Temperaturtest.
|
||||
|
||||
|
||||
### M028 automatische Druckbegrenzung Description: Sicherheitsventil begrenzt Druck. Verification: Funktionstest.
|
||||
|
||||
|
||||
### M029 sichere Sensorposition Description: Sensoren an sicheren Stellen montieren. Verification: Review.
|
||||
|
||||
|
||||
### M030 sichere Kabelführung Description: Kabel vor Beschädigung schützen. Verification: Inspektion.
|
||||
|
||||
|
||||
### M031 sichere Leitungsführung Description: Leitungen stabil verlegen. Verification: Sichtprüfung.
|
||||
|
||||
|
||||
### M032 vibrationsarme Konstruktion Description: Schwingungen minimieren. Verification: Vibrationsmessung.
|
||||
|
||||
|
||||
### M033 ergonomische Gestaltung Description: Bedienung ergonomisch gestalten. Verification: Nutzeranalyse.
|
||||
|
||||
|
||||
### M034 gute Sichtbarkeit Description: Gefahrenbereiche sichtbar machen. Verification: Sichtprüfung.
|
||||
|
||||
|
||||
### M035 intuitive Bedienoberfläche Description: Bedienfehler reduzieren. Verification: Usability Test.
|
||||
|
||||
|
||||
### M036 sichere Mensch‑Maschine‑Interaktion Description: sichere Interaktionskonzepte. Verification: Risikoanalyse.
|
||||
|
||||
|
||||
### M037 sichere Bedienhöhe Description: ergonomische Bedienhöhe. Verification: Designprüfung.
|
||||
|
||||
|
||||
### M038 sichere Reichweiten Description: Bediener erreicht Gefahrenbereich nicht. Verification: Distanzprüfung.
|
||||
|
||||
|
||||
### M039 sichere Wartungszugänge Description: sichere Wartungspunkte. Verification: Inspektion.
|
||||
|
||||
|
||||
### M040 sichere Montagepunkte Description: stabile Montagepunkte. Verification: Belastungstest.
|
||||
|
||||
|
||||
### M041 sichere Demontagepunkte Description: sichere Demontage ermöglichen. Verification: Test.
|
||||
|
||||
|
||||
### M042 sichere Servicezugänge Description: Servicebereiche sicher gestalten. Verification: Inspektion.
|
||||
|
||||
|
||||
### M043 sichere Software‑Fallbacks Description: definierter Zustand bei Fehler. Verification: Test.
|
||||
|
||||
|
||||
### M044 deterministische Steuerungslogik Description: klar definierte Zustände. Verification: Code Review.
|
||||
|
||||
|
||||
### M045 definierte Zustandsmaschine Description: klar strukturierte Steuerungszustände. Verification: Simulation.
|
||||
|
||||
|
||||
### M046 sichere Restart‑Logik Description: Neustart nur nach Freigabe. Verification: Funktionstest.
|
||||
|
||||
|
||||
### M047 sichere Fehlermodi Description: Fehler führt zu sicherem Zustand. Verification: Fault Test.
|
||||
|
||||
|
||||
### M048 sichere Energieabschaltung Description: Energiequellen trennen. Verification: Test.
|
||||
|
||||
|
||||
### M049 sichere Energieentladung Description: gespeicherte Energie abbauen. Verification: Messung.
|
||||
|
||||
|
||||
### M050 sichere Notzustände Description: Maschine geht in sicheren Zustand. Verification: Sicherheitsprüfung.
|
||||
|
||||
2 Technische Schutzmaßnahmen (M051–M140)
|
||||
|
||||
|
||||
### M051 feste trennende Schutzeinrichtung Description: mechanische Barriere verhindert Zugriff. Verification: Sichtprüfung.
|
||||
|
||||
|
||||
### M052 bewegliche Schutzeinrichtung Description: Tür oder Haube schützt Gefahrenbereich. Verification: Funktionstest.
|
||||
|
||||
|
||||
### M053 verriegelte Schutztür Description: Maschine stoppt beim Öffnen. Verification: Verriegelungstest.
|
||||
|
||||
|
||||
### M054 Lichtgitter Description: Unterbricht Maschine bei Zutritt. Verification: Sicherheitstest.
|
||||
|
||||
|
||||
### M055 Laserscanner Description: überwacht Gefahrenzone. Verification: Funktionsprüfung.
|
||||
|
||||
|
||||
### M056 Zweihandbedienung Description: beide Hände erforderlich. Verification: Test.
|
||||
|
||||
|
||||
### M057 Zustimmschalter Description: Bediener muss Schalter aktiv halten. Verification: Test.
|
||||
|
||||
|
||||
### M058 Not‑Halt Description: sofortige Maschinenabschaltung. Verification: Not‑Halt Test.
|
||||
|
||||
|
||||
### M059 Sicherheitsrelais Description: sichere Signalverarbeitung. Verification: Funktionsprüfung.
|
||||
|
||||
|
||||
### M060 sichere SPS Description: Steuerung mit Sicherheitsfunktionen. Verification: Validierung.
|
||||
|
||||
… (Maßnahmen M061–M139 folgen in gleicher Struktur)
|
||||
|
||||
|
||||
### M140 sichere Abschaltung bei Fehler Description: System stoppt automatisch. Verification: Fehler‑Simulation.
|
||||
|
||||
3 Benutzerinformation / organisatorische Maßnahmen (M141–M200)
|
||||
|
||||
|
||||
### M141 Warnhinweis Description: Warnung vor Gefahren. Verification: Dokumentenprüfung.
|
||||
|
||||
|
||||
### M142 Gefahrenkennzeichnung Description: visuelle Kennzeichnung. Verification: Inspektion.
|
||||
|
||||
|
||||
### M143 Betriebsanweisung Description: sichere Bedienung beschreiben. Verification: Dokumentenreview.
|
||||
|
||||
|
||||
### M144 Wartungsanweisung Description: Wartungsprozesse dokumentieren. Verification: Review.
|
||||
|
||||
|
||||
### M145 Reinigungsanweisung Description: sichere Reinigung beschreiben. Verification: Review.
|
||||
|
||||
|
||||
### M146 Schulungsprogramm Description: Mitarbeiterschulung. Verification: Trainingsnachweis.
|
||||
|
||||
|
||||
### M147 Sicherheitsunterweisung Description: jährliche Sicherheitsunterweisung. Verification: Protokoll.
|
||||
|
||||
|
||||
### M148 Bedienungsanleitung Description: vollständige Maschinenanleitung. Verification: Dokumentenprüfung.
|
||||
|
||||
|
||||
### M149 Servicehandbuch Description: Anleitung für Techniker. Verification: Review.
|
||||
|
||||
|
||||
### M150 Notfallanweisung Description: Verhalten im Notfall. Verification: Audit.
|
||||
|
||||
… (Maßnahmen M151–M199 folgen in gleicher Struktur)
|
||||
|
||||
|
||||
### M200 Notfallkontaktliste Description: Kontaktinformationen für Notfälle. Verification: Dokumentenprüfung.
|
||||
|
||||
322
ai-compliance-sdk/data/ce-libraries/roles-library-20.md
Normal file
322
ai-compliance-sdk/data/ce-libraries/roles-library-20.md
Normal file
@@ -0,0 +1,322 @@
|
||||
Roles Library — 20 Rollen vollständig beschrieben
|
||||
|
||||
Diese Rollenbibliothek beschreibt typische beteiligte Personengruppen bei Planung, Betrieb, Wartung und Prüfung von Maschinen oder Anlagen. Die Struktur ist so gestaltet, dass sie direkt in eine Compliance‑, CE‑ oder Risikobeurteilungs‑Engine integriert werden kann.
|
||||
|
||||
Struktur pro Rolle
|
||||
|
||||
role_id
|
||||
|
||||
title
|
||||
|
||||
description
|
||||
|
||||
primary_responsibilities
|
||||
|
||||
required_training
|
||||
|
||||
allowed_access
|
||||
|
||||
typical_lifecycle_phases
|
||||
|
||||
safety_relevance
|
||||
|
||||
|
||||
### R01 Maschinenbediener (Operator)
|
||||
|
||||
**Description:** Person, die die Maschine im täglichen Betrieb bedient.
|
||||
|
||||
**Primary Responsibilities:** - Starten und Stoppen der Maschine - Überwachung des Produktionsprozesses - Meldung von Störungen
|
||||
|
||||
**Required Training:** - Bedienerschulung - Sicherheitsunterweisung
|
||||
|
||||
**Allowed Access:** - Bedienpanel - Start/Stop Funktionen
|
||||
|
||||
**Typical Lifecycle Phases:** Normalbetrieb, Produktionsstart, Produktionsstopp
|
||||
|
||||
**Safety Relevance:** Hoch
|
||||
|
||||
|
||||
### R02 Einrichter (Setup Technician)
|
||||
|
||||
**Description:** Fachpersonal, das Maschinen für neue Produktionsaufträge einrichtet.
|
||||
|
||||
**Primary Responsibilities:** - Parametrierung der Maschine - Werkzeugwechsel - Prozessoptimierung
|
||||
|
||||
**Required Training:** - Maschineneinrichtung - Sicherheitsfunktionen
|
||||
|
||||
**Allowed Access:** - Setup-Modus - Parametrierung
|
||||
|
||||
**Typical Lifecycle Phases:** Einrichten, Produktionsstart
|
||||
|
||||
**Safety Relevance:** Hoch
|
||||
|
||||
|
||||
### R03 Wartungstechniker
|
||||
|
||||
**Description:** Techniker für Inspektion, Wartung und Reparatur.
|
||||
|
||||
**Primary Responsibilities:** - Wartung - Austausch von Komponenten - Fehlerdiagnose
|
||||
|
||||
**Required Training:** - Wartungsschulung - Lockout‑Tagout Verfahren
|
||||
|
||||
**Allowed Access:** - Wartungsmodus - interne Maschinenteile
|
||||
|
||||
**Typical Lifecycle Phases:** Wartung, Reparatur
|
||||
|
||||
**Safety Relevance:** Sehr hoch
|
||||
|
||||
|
||||
### R04 Servicetechniker
|
||||
|
||||
**Description:** Externer oder interner Spezialist für technische Unterstützung.
|
||||
|
||||
**Primary Responsibilities:** - Fehleranalyse - Systemupdates - technische Beratung
|
||||
|
||||
**Required Training:** - Herstellerschulung
|
||||
|
||||
**Allowed Access:** - Servicezugang
|
||||
|
||||
**Typical Lifecycle Phases:** Reparatur, Fernwartung
|
||||
|
||||
**Safety Relevance:** Hoch
|
||||
|
||||
|
||||
### R05 Reinigungspersonal
|
||||
|
||||
**Description:** Personal für Reinigung der Anlage.
|
||||
|
||||
**Primary Responsibilities:** - Reinigung der Maschine - Entfernen von Produktionsrückständen
|
||||
|
||||
**Required Training:** - Sicherheitsunterweisung
|
||||
|
||||
**Allowed Access:** - Reinigungsmodus
|
||||
|
||||
**Typical Lifecycle Phases:** Reinigung
|
||||
|
||||
**Safety Relevance:** Mittel
|
||||
|
||||
|
||||
### R06 Produktionsleiter
|
||||
|
||||
**Description:** Verantwortlich für Produktionsplanung und -überwachung.
|
||||
|
||||
**Primary Responsibilities:** - Produktionsplanung - Prozessüberwachung
|
||||
|
||||
**Required Training:** - Produktionsmanagement
|
||||
|
||||
**Allowed Access:** - Produktionsdaten
|
||||
|
||||
**Typical Lifecycle Phases:** Normalbetrieb
|
||||
|
||||
**Safety Relevance:** Mittel
|
||||
|
||||
|
||||
### R07 Sicherheitsbeauftragter
|
||||
|
||||
**Description:** Verantwortlicher für Arbeitssicherheit.
|
||||
|
||||
**Primary Responsibilities:** - Sicherheitsüberwachung - Risikoanalysen
|
||||
|
||||
**Required Training:** - Arbeitssicherheit
|
||||
|
||||
**Allowed Access:** - Sicherheitsdokumentation
|
||||
|
||||
**Typical Lifecycle Phases:** Alle
|
||||
|
||||
**Safety Relevance:** Sehr hoch
|
||||
|
||||
|
||||
### R08 Elektriker
|
||||
|
||||
**Description:** Fachkraft für elektrische Systeme.
|
||||
|
||||
**Primary Responsibilities:** - elektrische Wartung - Fehlersuche
|
||||
|
||||
**Required Training:** - Elektrotechnische Ausbildung
|
||||
|
||||
**Allowed Access:** - Schaltschrank
|
||||
|
||||
**Typical Lifecycle Phases:** Wartung, Reparatur
|
||||
|
||||
**Safety Relevance:** Sehr hoch
|
||||
|
||||
|
||||
### R09 Softwareingenieur
|
||||
|
||||
**Description:** Entwickler für Steuerungssoftware.
|
||||
|
||||
**Primary Responsibilities:** - Softwareentwicklung - Fehlerbehebung
|
||||
|
||||
**Required Training:** - Softwareentwicklung
|
||||
|
||||
**Allowed Access:** - Steuerungssysteme
|
||||
|
||||
**Typical Lifecycle Phases:** Softwareupdate
|
||||
|
||||
**Safety Relevance:** Hoch
|
||||
|
||||
|
||||
### R10 Instandhaltungsleiter
|
||||
|
||||
**Description:** Leitung der Wartungsabteilung.
|
||||
|
||||
**Primary Responsibilities:** - Wartungsplanung - Ressourcenkoordination
|
||||
|
||||
**Required Training:** - Instandhaltungsmanagement
|
||||
|
||||
**Allowed Access:** - Wartungsberichte
|
||||
|
||||
**Typical Lifecycle Phases:** Wartung
|
||||
|
||||
**Safety Relevance:** Hoch
|
||||
|
||||
|
||||
### R11 Anlagenfahrer
|
||||
|
||||
**Description:** Bediener komplexer Anlagen.
|
||||
|
||||
**Primary Responsibilities:** - Anlagenüberwachung
|
||||
|
||||
**Required Training:** - Anlagenbedienung
|
||||
|
||||
**Allowed Access:** - Steuerungssystem
|
||||
|
||||
**Typical Lifecycle Phases:** Normalbetrieb
|
||||
|
||||
**Safety Relevance:** Hoch
|
||||
|
||||
|
||||
### R12 Qualitätssicherung
|
||||
|
||||
**Description:** Verantwortlich für Qualitätskontrollen.
|
||||
|
||||
**Primary Responsibilities:** - Produktprüfung
|
||||
|
||||
**Required Training:** - Qualitätsmanagement
|
||||
|
||||
**Allowed Access:** - Qualitätsdaten
|
||||
|
||||
**Typical Lifecycle Phases:** Produktion
|
||||
|
||||
**Safety Relevance:** Niedrig
|
||||
|
||||
|
||||
### R13 Logistikpersonal
|
||||
|
||||
**Description:** Verantwortlich für Materialtransport.
|
||||
|
||||
**Primary Responsibilities:** - Materialbereitstellung
|
||||
|
||||
**Required Training:** - Logistikprozesse
|
||||
|
||||
**Allowed Access:** - Transportbereiche
|
||||
|
||||
**Typical Lifecycle Phases:** Transport
|
||||
|
||||
**Safety Relevance:** Mittel
|
||||
|
||||
|
||||
### R14 Fremdfirma
|
||||
|
||||
**Description:** Externe Dienstleister.
|
||||
|
||||
**Primary Responsibilities:** - Spezialarbeiten
|
||||
|
||||
**Required Training:** - Sicherheitsunterweisung
|
||||
|
||||
**Allowed Access:** - begrenzte Bereiche
|
||||
|
||||
**Typical Lifecycle Phases:** Wartung
|
||||
|
||||
**Safety Relevance:** Hoch
|
||||
|
||||
|
||||
### R15 Besucher
|
||||
|
||||
**Description:** Nicht geschulte Personen.
|
||||
|
||||
**Primary Responsibilities:** - keine
|
||||
|
||||
**Required Training:** - Sicherheitseinweisung
|
||||
|
||||
**Allowed Access:** - Besucherzonen
|
||||
|
||||
**Typical Lifecycle Phases:** Betrieb
|
||||
|
||||
**Safety Relevance:** Mittel
|
||||
|
||||
|
||||
### R16 Auditor
|
||||
|
||||
**Description:** Prüfer für Compliance und Sicherheit.
|
||||
|
||||
**Primary Responsibilities:** - Audits
|
||||
|
||||
**Required Training:** - Auditmethoden
|
||||
|
||||
**Allowed Access:** - Dokumentation
|
||||
|
||||
**Typical Lifecycle Phases:** Audit
|
||||
|
||||
**Safety Relevance:** Mittel
|
||||
|
||||
|
||||
### R17 IT-Administrator
|
||||
|
||||
**Description:** Verantwortlich für IT-Systeme.
|
||||
|
||||
**Primary Responsibilities:** - Netzwerkverwaltung
|
||||
|
||||
**Required Training:** - IT-Sicherheit
|
||||
|
||||
**Allowed Access:** - IT-Infrastruktur
|
||||
|
||||
**Typical Lifecycle Phases:** Betrieb
|
||||
|
||||
**Safety Relevance:** Hoch
|
||||
|
||||
|
||||
### R18 Fernwartungsdienst
|
||||
|
||||
**Description:** Externe Remote-Spezialisten.
|
||||
|
||||
**Primary Responsibilities:** - Remote Diagnose
|
||||
|
||||
**Required Training:** - Fernwartungssysteme
|
||||
|
||||
**Allowed Access:** - Remote-Zugang
|
||||
|
||||
**Typical Lifecycle Phases:** Fernwartung
|
||||
|
||||
**Safety Relevance:** Hoch
|
||||
|
||||
|
||||
### R19 Betreiber
|
||||
|
||||
**Description:** Eigentümer oder verantwortlicher Betreiber der Anlage.
|
||||
|
||||
**Primary Responsibilities:** - Gesamtverantwortung
|
||||
|
||||
**Required Training:** - Betreiberpflichten
|
||||
|
||||
**Allowed Access:** - Managementebene
|
||||
|
||||
**Typical Lifecycle Phases:** Alle
|
||||
|
||||
**Safety Relevance:** Sehr hoch
|
||||
|
||||
|
||||
### R20 Notfallpersonal
|
||||
|
||||
**Description:** Einsatzkräfte bei Unfällen.
|
||||
|
||||
**Primary Responsibilities:** - Rettung - Erste Hilfe
|
||||
|
||||
**Required Training:** - Notfallmanagement
|
||||
|
||||
**Allowed Access:** - Notfallzugänge
|
||||
|
||||
**Typical Lifecycle Phases:** Notfall
|
||||
|
||||
**Safety Relevance:** Kritisch
|
||||
|
||||
Reference in New Issue
Block a user